Oldest pages

Jump to navigation Jump to search

Showing below up to 28 results in range #1 to #28.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)

  1. Something (17:17, 21 May 2020)
  2. Completed Coliins 30S-1 (18:53, 22 May 2020)
  3. Moment of Truth (23:15, 23 May 2020)
  4. The Game Plan (23:52, 24 May 2020)
  5. The Acqusition (15:22, 26 May 2020)
  6. Moment(s) of Truth (01:06, 29 May 2020)
  7. Acquisition (23:49, 3 June 2020)
  8. Dealing with the RF Output (17:44, 4 June 2020)
  9. Modifications (00:19, 6 June 2020)
  10. Completed Collins 30S-1 (18:20, 9 June 2020)
  11. Plan Execution (17:34, 21 June 2020)
  12. Tuning & Loading Meter Circuit (20:17, 6 July 2020)
  13. Repair (17:56, 12 August 2020)
  14. 12V Safety and Control (18:00, 12 August 2020)
  15. CR216 and BIAS Multi-Metering (18:01, 12 August 2020)
  16. Screen Supply Overhaul (21:55, 13 August 2020)
  17. Primary AC Wiring (23:47, 13 August 2020)
  18. Fixing Damaged and Abused R218 (20:22, 11 November 2020)
  19. Dealing with the Overheated and Cracked R232 (20:29, 11 November 2020)
  20. BIAS Transformer T203, and Associated Circuitry (20:39, 11 November 2020)
  21. Power Supply & Lower Compartment (21:49, 11 November 2020)
  22. Dials (17:16, 14 November 2020)
  23. Operation (22:15, 4 January 2021)
  24. 160m Mods (14:16, 19 February 2021)
  25. Testing (21:54, 29 June 2021)
  26. Main Page (21:52, 30 June 2021)
  27. Updates and Changes (01:53, 17 January 2025)
  28. How and Why I Changed It (22:46, 4 May 2025)

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)