Oldest pages

Jump to navigation Jump to search

Showing below up to 28 results in range #1 to #28.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)

  1. Something‏‎ (17:17, 21 May 2020)
  2. Completed Coliins 30S-1‏‎ (18:53, 22 May 2020)
  3. Moment of Truth‏‎ (23:15, 23 May 2020)
  4. The Game Plan‏‎ (23:52, 24 May 2020)
  5. The Acqusition‏‎ (15:22, 26 May 2020)
  6. Moment(s) of Truth‏‎ (01:06, 29 May 2020)
  7. Acquisition‏‎ (23:49, 3 June 2020)
  8. Dealing with the RF Output‏‎ (17:44, 4 June 2020)
  9. Modifications‏‎ (00:19, 6 June 2020)
  10. Completed Collins 30S-1‏‎ (18:20, 9 June 2020)
  11. Plan Execution‏‎ (17:34, 21 June 2020)
  12. Tuning & Loading Meter Circuit‏‎ (20:17, 6 July 2020)
  13. Repair‏‎ (17:56, 12 August 2020)
  14. 12V Safety and Control‏‎ (18:00, 12 August 2020)
  15. CR216 and BIAS Multi-Metering‏‎ (18:01, 12 August 2020)
  16. Screen Supply Overhaul‏‎ (21:55, 13 August 2020)
  17. Primary AC Wiring‏‎ (23:47, 13 August 2020)
  18. How and Why I Changed It‏‎ (20:50, 23 September 2020)
  19. Fixing Damaged and Abused R218‏‎ (20:22, 11 November 2020)
  20. Dealing with the Overheated and Cracked R232‏‎ (20:29, 11 November 2020)
  21. BIAS Transformer T203, and Associated Circuitry‏‎ (20:39, 11 November 2020)
  22. Power Supply & Lower Compartment‏‎ (21:49, 11 November 2020)
  23. Dials‏‎ (17:16, 14 November 2020)
  24. Operation‏‎ (22:15, 4 January 2021)
  25. 160m Mods‏‎ (14:16, 19 February 2021)
  26. Testing‏‎ (21:54, 29 June 2021)
  27. Updates and Changes‏‎ (21:47, 30 June 2021)
  28. Main Page‏‎ (21:52, 30 June 2021)

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)